Built in 1968, Kenan Laboratories is a ten story, 140,410 sf teaching laboratory facility for the Chemistry and Applied Physical Sciences Departments. This project will renovate approximately 23,000 sf laboratory and office space located on the 7th and 8th floors. Additional infrastructure upgrades for this project will include the construction of new restroom facilities on floors 4-8, the installation of three new rooftop air handling units that will serve floors 5-9 and the installation of a new wet pipe fire sprinkler system for floors 3-9 and the basement, in order to meet the current NFPA fire protection requirements. The project must be accomplished in multiple phases while the building remains occupied.
Project budget: $15,743,000
Please contact the project manager only by email for a complete Request for Proposals.
Project Manager: Tom Loter
Phone number: 919-843-3238
Contact email: thomas.loter@facilities.unc.edu
Pre-bid date: 12/05/2016
Pre-bid time: 11:00 am
Pre-proposal location: Murray Hall, 1st Floor Conference Room, 121 South Road, Chapel Hill, NC 27514
Closing date: 12/22/2016
Submit to:
University of North Carolina at Chapel Hill
Tom Loter
Facilities Planning and Design Department
Suite 202
Giles F. Horney Building
103 Airport Drive
Campus Box # 1090
Chapel Hill, NC 27599-1090