- Project Name
- Bingham Facility 2 - HVAC Replacement
- Type of Services
- Engineering
- Project Manager
- Kyle Hawkins
- Phone Number
- (919) 609-7080
- Contact Email
- wkhawkin@unc.edu
- Closing Date
- 02/07/2025
- Project Budget
- 2000000
Project Description
Bingham Facility 2 is currently served by two 100% outside air DX cooling/propane gas heating units located on the building roof. The units were designed to condition 8000 CFM to maintain an indoor temperature to 70-74F. This project will replace the current systems with a system to be able to maintain required conditions. The new system will include design and installation of a new air-cooled chiller and a new propane hot water boiler as part of this project.
Pre-proposal Meeting is on 1/24/2025 at 1 p.m. via ZOOM.
https://unc.zoom.us/j/91751365891
Meeting ID: 917 5136 5891
Kyle Hawkins, PE
UNC-Chapel Hill
Facilities Planning & Design
Giles F. Horney Building
103 Airport Drive
Chapel Hill, NC 27599
Advertisement Type: Designer Solicitations