- Project Name
- Joyner HVAC Improvements, Bathroom Improvements, and Window Replacement
- Type of Services
- Architectural/Engineering
- Project Manager
- Mayowa Alabi
- Phone Number
- (919) 966-9475
- Contact Email
- mayowa@fac.unc.edu
- Closing Date
- 01/29/2018
- Project Budget
- 5636000
Project Description
Project Walk Through: January 18, 2018 at 1:30 p.m. at the eastern entrance of Joyner Hall, located at 205 Raleigh Street, Chapel Hill, NC 27514.
Improvements to an approximately 41,500 Sq. Ft, 4-story residence hall. The improvements include replacement and upgrades to the existing HVAC systems, ADA upgrades, renovation of 14 multi-user bathrooms (plus two single-user bathrooms), repairs at the slate roof, and fall protection installation.
Submit Letters of Interest and Current SF-330 to:The University of North Carolina at Chapel Hill
Mayowa Alabi, RA, LEED AP BD+C
Facilities Planning and Design Dept.
Giles F. Horney Building
Suite 202
103 Airport Drive, Campus Box 1090
Chapel Hill, NC 27599-1090
Advertisement Type: Designer Solicitations