- Project Name
- Tate-Turner-Kuralt - Elevator Replacement
- Type of Services
- Architectural/Engineering
- Project Manager
- Andrea Janusz, RA
- Phone Number
- (984) 484-4668
- Contact Email
- andrea.janusz@facilities.unc.edu
- Closing Date
- 02/07/2025
- Project Budget
- 1000000
Project Description
The Tate-Turner-Kuralt Building was constructed in 1995 and is located at 325 Pittsboro Street, Chapel Hill, NC. The current traction type 2500 lb. rated elevators (DOL #15244, #15245) are original, and each serve five floors. Extensive elevator repairs are needed including the modernization and upgrades to controls, machines, car, wiring, hoist way, pit, cab, doors and communication components. ADA compliant wall control upgrades on each level are required as well.
Pre-proposal Meeting is 1/23/2025 at 11 a.m. via ZOOM.
https://unc.zoom.us/j/96442721763
Meeting ID: 964 4272 1763
Andrea Janusz, RA
UNC-Chapel Hill
Facilities Planning & Design
Giles F. Horney Building
103 Airport Drive
Chapel Hill, NC 27599
Advertisement Type: Designer Solicitations