Skip to main content

Engineering and Construction has the overall responsibilities for engineering, planning, design and implementation activities; energy management; and construction and management services for capital projects for new construction, renovations and repairs.

Departments

Contact

Evan Yassky
Interim Executive Director
Phone: 919-843-5103
Email: evan.yassky@facilities.unc.edu

News

Map of Ridge Road lane closure
Ridge Road Lane Closure Begins Jan. 8

January 7, 2025

A portion of the south lane on Ridge Road will be closed Jan. 8 - 14. Two-way traffic will be maintained through automated signals.

energy savings graphic
2024 Winter Holiday Energy Saving Initiative

December 2, 2024

The University will implement a Winter Holiday Energy Saving Initiative Dec. 25 through Jan. 1 to reduce energy consumption in unoccupied buildings.

Ridge Road closure detour map
Ridge Road Closed to Through Traffic Dec. 1 – Jan. 8

November 21, 2024

Ridge Road will be closed to through traffic between Stadium Drive and the Boshamer Stadium Parking Lot. Traffic will be detoured along Manning Drive and South Road / Raleigh Road.