Facilities Engineering Resources
Documents
- Informal Construction Contract – Front End with Supplementary General Conditions
- Designers should update the Scope of Work, Alternates/Unit Prices, and Supplementary General Conditions for their specific project.
- Projects <$100,000 Total Project Cost
- Projects >$100,000 Total Project Cost
- Informal Construction Guidelines
- ConnectCarolina Vendor Masterfile payment paperwork
- In order to be set up in our payment as a vendor, please complete the Vendor Masterfile form and return it along with a copy of your W-9 to our Business Coordinator, Cody Pace.
- State Construction Office Forms
- State Construction Manual
- Design Guidelines
- Project Close-Out Guidelines
Links
- UNC-Chapel Hill Planroom (Login required for full access)
- UNC-Chapel Hill GIS
- ProjNet/DrChecks (login required)
- UNC-Chapel Hill Environment, Health and Safety
- UNC-Chapel Hill Energy Services (all utilities)
- UNC Subsurface Utility Location Services (Contractors shall coordinate with the PM/CM to conduct all Call-Before-You-Dig due diligence. This is a three-part effort of contacting:)
- UNC-Chapel Hill Electric Distribution Systems at 919-962-8394. Currently there is no online or email verification of this service. You must contact them by phone.
- NC 811. This service is available online, but since campus addresses can be difficult to explain, we recommend you call them to fully describe the location in question.
- In special cases, there may be additional underground conduit not captured by the above two services (e.g., trunk irrigation IT lines). The best way for these items to be identified is in the project review meetings with key UNC stakeholders (especially Cogen, Chilled Water, and Grounds/Landscape Architecture).
- Campus Map
- UNC-CH Board of Trustees Meeting Schedule and Agenda
- State Construction Office
- NC General Statutes