Skip to main content

6.4 million gross square feet—30% of campus space—is located in buildings rated as worst, severe, or poor condition. The Master Plan addresses the quality of existing spaces in three ways: proposed major renovation, deferred maintenance repairs, and demolition. The plan proposes over 1.9 million square feet of major renovation to facilities and spaces, infusing fresh energy into buildings where major programmatic changes are proposed. These renovations are opportunities to modernize facilities to accommodate today’s teaching, research, and workplace needs. The plan also recognizes the substantial need to address deferred maintenance and ensure buildings stay in good condition. The University will execute those projects as funding becomes available, and the Master Plan does not itemize deferred maintenance specifically.

Proposed Major Renovation
Building ID Building Number Site Name Total (GSF)
R1 129 Spencer Residence Hall 44,577
R2 112 Manly Residence Hall 26,490
R3 111 Mangum Residence Hall 26,631
R4 80 Davis Library 430,141
R5 17 Gardner Hall 41,380
R6 7 Bingham Hall 25,943
R7 24 Wilson Library 316,694
R8 65 Graham Student Union 152,022
R9 541 Student Recreation Center 38,556
R10 468 Fetzer Hall 169,913
R11 566 Kenan Stadium Guest Box 38,480
R12 214 Carrington Hall 152,285
R13 101 Avery Residence Hall 64,309
R14 105 Ehringhaus Residence Hall 156,315
R15 109 Hinton James Residence Hall 220,478
Proposed Demolition
Building ID Phase Building Number Site Name Total (GSF)
D1 near 165 134 E. Franklin Street 13,060
D2 near N/A 128 E. Franklin Street 13,485
D3 near 426 Hill Commercial* 6,785
D4 near 148 Porthole Building 4,462
D5 near 51 Evergreen House 3,763
D6 long 161 Abernethy Hall and Annex 17,188
D7 mid 13 Davie Hall 80,508
D8 long 108 Grimes Residence Hall 23,991
D9 long 117 Ruffin Jr. Residence Hall 23,991
D10 long 302B 218 Wilson Street 1,517
D11 mid 130 Whitehead Hall 19,333
D12 near 31 Naval Armory (ROTC)** 18,519
D13 mid 65 Student Union Addition 27,501
D14 long 46 Wilson Hall Addition 57,000
D15 near 219 Berryhill Hall 126,198
D16 near 119 Teague Residence Hall 51,013
D17 near 116 Parker Residence Hall 46,008
D18 mid 469 Taylor Campus Health 61,425
D19 mid 207 Medical School Wing B 21,339
D20 mid 221 Medical School Wing C 20,829
D21 mid 208 Medical School Wing D 23,611
D22 mid 222 Medical School Wings E and F 19,143
D23 near 296 UNC Hospitals Paint Shop 0
D24 mid 430 Public Safety Building 23,447
D25 long 104 Craige Residence Hall 154,307
D26 long 236 Molecular Biology Research Lab/Glaxo 26,927
D27 long 552 Medical School Building 52 4,131
D28 long 241 Ambulatory Care Center 137,470
D29 mid 510-523 Trailers 46-49 4,575
D30 mid 327 Medical Research Building B 5,155
D31 near multiple Grounds Shop (13 structures) 17,402
D32 near multiple Odum Village (44 structures) 223,271
D33 long 428 1301 Mason Farm Road 3,255
D34 long 668 1303 Mason Farm Road 3,352
D35 long 611 1307 Mason Farm Road 3,010
D36 long 396A 1404 Mason Farm Road 2,599
D37 long 397 1450 Mason Farm Place (2 structures) 3,196
D38 long 398 1500 Mason Farm Road 2,434
D39 long 395 1506 Mason Farm Road 3,683

Proposed Major Renovation and Demolition Map

* The UNC Board of Trustees adopted the Resolution to Remove the 138 East Franklin Street from the Proposed Demolition List on May 17, 2023
** The UNC Board of Trustees adopted the Resolution to Remove the Naval Armory from the Proposed Demolition List on May 17, 2023

Campus North and Central Proposed Projects
Site ID Phase Site Name Ground Floor Footprint (GSF) Floors Total (GSF) Total Parking Spaces
N1 long Granville Towers Infill 12,200 4 48,800
N2 near Porthole Alley Redevelopment 38,000 4-5 190,000
N3 long Ackland Expansion 7,200 3 21,600
N4 long Morehead Addition 4,666 3 14,000
N5 long Abernethy Replacement 21,500 4 86,000
N6 long Smith Addition 3,400 3 10,200
N7 mid Davie Replacement 16,500 4 66,000
N8 long Wilson St. Redevelopment 15,900 4 63,600
N9 long Wilson St. Parking Garage 49,500 4 198,000 710
N10 long Upper Quad North 12,500 4 50,000
N11 long Upper Quad South 12,500 4 50,000
N12 long Jackson Addition 3,300 2 6,600
N13 mid Whitehead Redevelopment 19,200 4 76,800
N14 near Institute for Convergent Sciences 48,300 4 193,200
N15 mid Carolina Union Renovation and Expansion 18,500 4 74,000
C1 long Wilson Addition 9,600 3 28,800
C2 long Wilson Annex Redevelopment 16,500 4 66,000
C3 mid Student Recreation Center Expansion 32,000 4 128,000
C4 mid Medical Drive Building 16,700 8 133,600
C5 near Medical Education Building 21,300 9 171,000
C6 mid Campus Health and Wings Replacement 30,300 5 151,500
C7 mid Kenan Stadium Expansion 30,100 5 150,500
C8 near Parker and Teague Redevelopment 40,250 7, 1 story pavilion 242,000
C9 long Hill Alumni Center Addition 4,000 3 12,000
C10 near Hospital Central Generator 12,700 2 25,400
C11 near Parking Garage 32,400 6 194,400 650
C12 long Hospital Parking 63,900 4 255,600 730
C13 mid Public Safety Replacement 31,600 4 126,400

Campus North and Central Proposed Projects Map

Campus South Proposed Projects
Site ID Phase Site Name Ground Floor Footprint (GSF) Floors Total (GSF) Total Parking Spaces
S1 long Glaxo Redevelopment 40,500 5 202,500
S2 mid POB Expansion 15,900 4 63,600
S3 mid Craige Deck Expansion 23,000 4 92,000
S4 long ACC Redevelopment 24,200 5 121,000
S5 mid ACC Redevelopment 21,900 5 109,500
S6 long ACC Redevelopment 24,800 5 124,000
S7 long ACC Redevelopment – Parking 64,900 6 389,400 1,300
S8 near Translational Research Building 26,000 8 160,000
S9 near Biotechnology Collaboration Building 39,900 3-6 190,300
S10 long Research and Entrepreneurship Buildings 20,200 5-6 115,800
S11 long Community Building 4,800 2 9,600
S12 mid Research and Entrepreneurship Buildings 26,800 5-7 166,200
S13 mid Research and Entrepreneurship Buildings 23,900 6-7 160,400
S14 mid Graduate Housing 14,500 6 87,000
S15 long Parking Garage 28,800 7 230,400 660
S16 near Parking Garage 55,900 5 279,500 960
S17 near Graduate Housing 21,400 5 107,000
S18 mid Physical Plant Expansion 32,100 1 32,100
S19 long Craige Redevelopment North 22,800 5 114,000
S20 long Craige Redevelopment South 23,400 5 117,000
S21 mid Graduate Housing 19,900 5-7 120,500
S22 near Business School Expansion Site 37,700 5 188,500
S23 long Skipper Bowles Recreation Field and Parking 76,800 1 76,800 220
S24 long Skipper Bowles Redevelopment 31,500 5 157,500
S25 long Skipper Bowles Redevelopment Parking 47,500 1 47,500 135
S26 long Parking Garage with Recreation Courts 46,000 2 92,000 260
S27 long Manning Lot Redevelopment 15,600 5 78,000
S28 long Manning Lot Redevelopment Parking Garage 49,700 5 248,500 850
S29 long Future Housing 17,800 4 71,200
S30 long Academic Building Site 21,900 5 109,500
S31 long Fordham Blvd. Mixed-Use Redevelopment 55,700 5 278,500
S32 long Fordham Blvd. Redevelopment Parking Garage 48,500 5 291,000 830
S33 long Fordham Blvd. Mixed-Use Redevelopment 7,400 4 29,600

Campus South Proposed Projects Map

Phasing - Near Term (0-7 Years)

1
Porthole Alley Redevelopment
2
Institute for Convergent Science
3
Medical Education Building
4
Parker + Teague Redevelopment
5
Stadium Drive Improvements
6
Central Generator Plant + S1 Garage
7
Graduate Housing and parking deck
8
Translational Research Building
9
Biotechnology Collaboration Building + other research and entrepreneurship growth
10
Business School Expansion
Phasing - Mid-Term (7-15 Years)
Phasing (Long-Term)