With help from various industry groups, the Renewable Energy Special Projects Committee paid for the installation of 19.8 kW solar panel system on the roof of the Graham Student Union. The system consists of 64 panels and can produce up to 24,000 kWh of energy each year. For more information, check out this article from chapelboro.com or the flyer from the event.
Solar Panel Installation on Graham Student Union
Comments are closed.