Skip to main content

South Road Pedestrian Detour Map South Road Will Reopen Aug. 11

August 10, 2017

South Road will reopen to through traffic between UNC Student Stores and Raleigh Street Friday, Aug. 11, 2017. This portion of South Road has been closed since May 15 due to a utility improvements project.

Categories: Construction News, Summer Construction News


Construction Equipment Construction Keeps Campus Busy Over the Summer

August 8, 2017

Even with most students away on summer break, Carolina’s campus is still buzzing with activity as construction crews work on several projects across campus.

Categories: Construction News, Summer Construction News


Lenoir Drive Resurfacing Map Lenoir Drive Closed for Resurfacing

August 2, 2017

The Utility Improvement project to repair and replace pipes beneath Lenoir Drive has been completed. Lenoir Drive will remain closed for resurfacing and striping Aug. 2, 2017, through Aug. 10, 2017, and is expected to reopen to through traffic Aug. 11.

Categories: Construction News, Summer Construction News


Waste Assessment: Academic Year 2016-2017

July 31, 2017

Orange County contracted Kessler Consulting, Inc. to conduct a waste composition study (WCS). The purpose of the study was to understand the percentages of various materials, including recyclable materials, currently being landfilled within the County.

Categories: Office of Waste Reduction and Recycling News


McColl Roofing Project Map Roofing Project Will Begin at McColl Building July 31

July 31, 2017

A roofing project at the McColl Building will require the closure of portions of the sidewalk along the plaza side of the building beginning July 31, 2017, through Aug. 19, 2017.

Categories: Construction News