News
South Road Will Reopen Aug. 11
South Road will reopen to through traffic between UNC Student Stores and Raleigh Street Friday, Aug. 11, 2017. This portion of South Road has been closed since May 15 due to a utility improvements project.
Categories: Construction News, Summer Construction News
Construction Keeps Campus Busy Over the Summer
Even with most students away on summer break, Carolina’s campus is still buzzing with activity as construction crews work on several projects across campus.
Categories: Construction News, Summer Construction News
Lenoir Drive Closed for Resurfacing
The Utility Improvement project to repair and replace pipes beneath Lenoir Drive has been completed. Lenoir Drive will remain closed for resurfacing and striping Aug. 2, 2017, through Aug. 10, 2017, and is expected to reopen to through traffic Aug. 11.
Categories: Construction News, Summer Construction News
Waste Assessment: Academic Year 2016-2017
Orange County contracted Kessler Consulting, Inc. to conduct a waste composition study (WCS). The purpose of the study was to understand the percentages of various materials, including recyclable materials, currently being landfilled within the County.
Categories: Office of Waste Reduction and Recycling News
Roofing Project Will Begin at McColl Building July 31
A roofing project at the McColl Building will require the closure of portions of the sidewalk along the plaza side of the building beginning July 31, 2017, through Aug. 19, 2017.
Categories: Construction News