- Project Name
- Memorial Hall Comprehensive Roof Replacement
- Type of Services
- Engineering/Architectural
- Project Manager
- Andrea Janusz
- Phone Number
- Contact Email
- andrea.janusz@facilities.unc.edu
- Closing Date
- 04/13/2022
- Project Budget
- 1500000
Project Description
Rebuilt in 1931, Memorial Hall is largest Performing Arts venue at UNC Chapel Hill and was renovated in 2005. This project will be a comprehensive replacement of all roofing, including the membrane barrel roof, built-up roofs and metal roofs. The entire roof footprint is approx. 20,000 SF total. This project will remove all existing roof systems down to the existing structural deck, repair and/or replace any damaged roof decking and install the new roof systems along with sheet metal flashing and accessories to provide a complete, watertight roof assembly.
Submit Letters of Interest and Current SF-330 to:Andrea Janusz
andrea.janusz@facilities.unc.edu
Advertisement Type: Designer Solicitations