Skip to main content

Construction Bids – South Building Accessibility Improvements (Garden Level Renovation)

Pre-bid date: 05/07/2024| Bid date: 05/14/2024| Advertisement type: Construction Bids

Construction Bids – East Cameron Avenue Walkway and Arbor Restoration

Pre-bid date: 04/17/2024| Bid date: 05/13/2024| Advertisement type: Construction Bids

Construction Bids – Campuswide Parking Repairs – Package #3

Pre-bid date: 04/15/2024| Bid date: 05/06/2024| Advertisement type: Construction Bids

Construction Bids – Parking Decks LED Lighting Safety Upgrades: Jackson, Rams Head, Cobb Decks

Pre-bid date: 04/03/2024| Bid date: 04/26/2024| Advertisement type: Construction Bids

Construction Bids – South Building and Carroll Hall (Section C) Roof Replacement and Fall Protection

Pre-bid date: 04/02/2024| Bid date: 04/25/2024| Advertisement type: Construction Bids

Designer Solicitations – Phillips Hall 1960 Building Window Replacement

Phillips Hall - South Addition, is located at 120 E. Cameron Avenue and was constructed and completed in 1960. The existing wood windows at the South Addition are in poor condition primarily because they have exceeded their normal service life. This project will be a comprehensive window replacement of all wood windows located at the 1960 building addition.

Closing date: 04/18/2024| Advertisement type: Designer Solicitations

Designer Solicitations – Brauer Hall Fire Alarm Systems – Replace Fire Alarm Initiating Devices and Control Panel

This project will replace the fire alarm control panel and initiating devices in Brauer Hall. Brauer Hall is located at 140 Dental Circle and is part of a four building Dental complex which consists of Brauer Hall, First Dental, Koury Oral, and Tarrson Hall. The current fire alarm system located in all four buildings is a Pyrotronics MXL system with a total of 2,683 devices.

Closing date: 04/18/2024| Advertisement type: Designer Solicitations

Designer Solicitations – FPG Student Union – North Roof Replacement

The project will replace the roofing of the Student Union's north building, approximately 51,000 square feet. Design Services shall be comprehensive of all disciplines required for this scope.

Closing date: 04/16/2024| Advertisement type: Designer Solicitations

Construction Bids – Genetic Medicine Building (GMB) First Floor Lab Renovation

Pre-bid date: 03/21/2024| Bid date: 04/04/2024| Advertisement type: Construction Bids

Construction Bids – Memorial Hall Roof Replacement

Pre-bid date: 02/21/2024| Bid date: 03/21/2024| Advertisement type: Construction Bids