Skip to main content

Construction Bid Solicitations from Prequalified Subcontractors – Avery Residence Hall Renovations Bid Pack 2

Bid date: 07/19/2024| Advertisement type: Construction Bid Solicitations from Prequalified Contractors

Construction Bid Solicitations from Prequalified Subcontractors – Avery Residence Hall Renovations Bid Pack 1

Pre-bid date: 06/25/2024| Bid date: 07/10/2024| Advertisement type: Construction Bid Solicitations from Prequalified Contractors

Designer Solicitations – Gene Therapy Center Renovation

Located in the Thurston-Bowles Building, the UNC School of Medicine Gene Therapy Center occupies approximately 18,000 sf of space on the fifth and seventh floors. This project will renovate approximately 4,000 sf of laboratory and supporting spaces to facilitate the Center’s primary mission of developing novel gene delivery systems and executing translational research for a patient population affected by genetic disorders.

Closing date: 06/12/2024| Advertisement type: Designer Solicitations

Construction Bids – Tarrson Hall Envelope Repairs

Pre-bid date: 05/22/2024| Bid date: 06/06/2024| Advertisement type: Construction Bids

Construction Bids – South Building Accessibility Improvements (Garden Level Renovation)

Pre-bid date: 05/07/2024| Bid date: 05/29/2024| Advertisement type: Construction Bids

Construction Bids – East Cameron Avenue Walkway and Arbor Restoration

Pre-bid date: 04/17/2024| Bid date: 05/13/2024| Advertisement type: Construction Bids

Construction Bids – Campuswide Parking Repairs – Package #3

Pre-bid date: 04/15/2024| Bid date: 05/06/2024| Advertisement type: Construction Bids

Construction Bids – Parking Decks LED Lighting Safety Upgrades: Jackson, Rams Head, Cobb Decks

Pre-bid date: 04/03/2024| Bid date: 04/26/2024| Advertisement type: Construction Bids

Construction Bids – South Building and Carroll Hall (Section C) Roof Replacement and Fall Protection

Pre-bid date: 04/02/2024| Bid date: 04/25/2024| Advertisement type: Construction Bids

Designer Solicitations – Phillips Hall 1960 Building Window Replacement

Phillips Hall - South Addition, is located at 120 E. Cameron Avenue and was constructed and completed in 1960. The existing wood windows at the South Addition are in poor condition primarily because they have exceeded their normal service life. This project will be a comprehensive window replacement of all wood windows located at the 1960 building addition.

Closing date: 04/18/2024| Advertisement type: Designer Solicitations